
PROJECT / 06
Project scope
The record shows kitchen installations and associated fit-out work in Bern. It includes cabinet installation, worktop and splashback preparation, integrated lighting, and wall and surface finishes. The photographs cover different stages and spaces.
- Location
- Bern
- Year
- 2026
- Category
- Kitchen Renovation / Interior Fit-Out / Cabinet & Lighting Installation
- Documentation
- 3 project photographs
06DELIVERY
Work and key elements.
01
Installation of white kitchen cabinets and fitted units
02
Worktop and splashback preparation
03
Integration of under-cabinet lighting
04
Wall and surface work within the kitchen area
05
Documentation of different installation and fit-out stages
PROJECT DOCUMENTATION / 03Close to material,
Close to material,
delivery and detail.
The photographs show documented project stages. Images from active construction phases are not presented as completed handovers.
A good project begins with a clear conversation.
Tell us briefly about the existing condition, location and required work. We will discuss the most practical next step with you.
